BARANGAROO REMEDIATION
Hercules was the lead hydraulic installer for this project. 4km worth hydraulic lines were installed throughout the ground including, 315mm HDPE pipe for rainwater catchment, 110mm HDPE pump out lines and 100mm fire hydrant line. As the job was progressing, some area required custom made fittings to be installed.
It was a pleasure working with Ventia & Lendlease on a large project like this. Big thanks goes to everyone that worked on this job.
DATE
2018
LOCATION
Sydney
PROJECT TYPE
Commerical